WRPS: Waste Removal

WRPS: Tank Operations
October 11, 2018
WRPS – Tank Integrity
October 12, 2018
WRPS: Tank Operations
October 11, 2018
WRPS – Tank Integrity
October 12, 2018

WRPS: Waste Removal

AZ02-pull
A Tank Farm Project team successfully removes a failed 45-foot, 3-inch vertical turbine pump.
AY-102-complete
An in-tank image shows the air-lift circulators and residual waste in double-shell tank AY-102.
20180405_204750
Scientists melt radioactive waste into glass in a test platform designed to mimic the Direct Feed Low-Activity Waste system being constructed at Hanford.
20180301_0937581
Riggers use a crane to hold a tent frame while vertical support legs are cut off.
20180301_0921461
The roof structure is then lowered to the ground for disassembly.