WRPS: Tank OperationsOctober 11, 2018WRPS – Tank IntegrityOctober 12, 2018 WRPS: Waste Removal October 11, 2018 Categories Tags A Tank Farm Project team successfully removes a failed 45-foot, 3-inch vertical turbine pump. An in-tank image shows the air-lift circulators and residual waste in double-shell tank AY-102. Scientists melt radioactive waste into glass in a test platform designed to mimic the Direct Feed Low-Activity Waste system being constructed at Hanford. Riggers use a crane to hold a tent frame while vertical support legs are cut off. The roof structure is then lowered to the ground for disassembly. Related